Free replay

How can you optimise your CIP cycle and reduce the resources it consumes?

30 min · Recorded on 22 September 2026 · French audio, English subtitles

On a CIP line, the water/product changeover is set on a timer calibrated for the worst case. The result: recoverable raw material goes down the drain, and the line stays out of production longer than necessary. This webinar shows how to control this transition based on a real measurement.

The content

What you will see

  • Why a timer calibrated for the "worst case" sends still-recoverable raw material down the drain, with every cycle.
  • How the SCAN42 identifies the liquid flowing through the line in real time: electrical impedance tomography and AI embedded in the sensor.
  • The case of a leading North American dairy producer: 0% dilution in the tank, 0% pure milk sent down the drain.
  • A live demo on our test loop

Speakers

Presented by

Mathieu Darnajou, PhD
Inventor of the SCAN42, founder of fluiidd

Houria Amarouche
fluiidd

And on your own line, how much does that add up to?

30 minutes with our team to review your CIP cycles and estimate what they cost you today.